Slidehide Sequence of Installation

Prefabricated SLIDEHIDE Cavity Door System being delivered to the site

SLIDEHIDE Cavity Door System being installed within the structural opening provided in accordance to the required door opening.
Application Location – Dry/Wet Kitchen

SLIDEHIDE Cavity Wall Frame Being Plastered
Application Location – Dry/Wet Kitchen

View of SLIDEHIDE Cavity Wall Frame Before Installation of Door Panel and Frame

View of SLIDEHIDE Cavity Door System From The Dry Kitchen After Installation of Door Panel and Frame

Side View of SLIDEHIDE Cavity Door System After Installation of Door Panel and Frame

View of SLIDEHIDE Cavity Door System With Door Fully Opened And Hidden Inside The Cavity Frame

View of SLIDEHIDE Cavity Door System From The Wet Kitchen. Tiles Can Be Applied Directly onto The Plastered Cavity Wall Frame